Case Study  / Moorebank Ave Upgrade Works

Moorebank Ave Upgrade Works · Moorebank Ave Upgrade Works - Moorebank NSW

ProductGP43K Metro and GP56K Eco solar lighting towers from the Globe Power range
03The Benefit

Reduction in Fuel and Operational Costs

264,600 hours Engine Runtime Hours (average 12hrs/night)
264,600 Diesel (Saving 1L per hour)
$687,960 Diesel Cost ($2.60 per litre)
1,111L Engine Oil
529 Engine Services on Site

Key Products

Metro GP43K

Runtime: 42 hours

Output: 43,000 lumens

Battery: 10.2kWh Lithium

Features: Solar powered lighting, No operating noise, Lithium-ion battery, No emissions

GP56K Eco

Runtime:: 30 hours

Output:: 56,000 lumens

Battery:: 10.8kWh Deep Cycle Gel

Features:: High-powered lighting, No diesel costs, Rapid deployment, Durable design

Send an Enquiry

Fill out the form below and one of our experienced team members will be in touch with you as soon as possible.















    Back to top